Building Infrastructure
Building Infrastructure
Shenzhen, China
52,000 m²
Total Area
16 months
Project Duration
21%
Cost Saving
Challenge
Building infrastructure projects involve a wide range of structural components, repeated floor cycles and strict requirements on concrete surface quality. Traditional steel formwork is heavy, which slows down hoisting and repeated turnover between floors.
Our Solution
Plastic steel formwork is light and rigid, and can be assembled flexibly for walls, columns and beams. The dense forming surface delivers flat concrete that requires no additional plastering after demoulding. Panels are reusable across many floor cycles, which shortens the formwork turnaround time and lowers labour cost on building projects.
Products Used
Wall FormworkBeam Formwork
Application in Canal Structures

Start Your Project With Us
Let us help you achieve similar results on your next construction project.
Contact Us Today